PLANNING SUB-COMMITTEE REPORT DECEMBER 2024-JANUARY 2025

CONSULTATIONS SINCE LAST MEETING

The Society has received twenty (20) Planning Consultation notices in respect of properties across the Borough since the last formal report to the Executive on 12 November 2024.

If Committee Members wish to know the full response of the Planning Sub-Committee to one of the above applications, use this link for Gosport Planning Applications, https://publicaccess.gosport.gov.uk/onlineapplications/ insert the planning application reference in the box, click Search, then click on Documents to read Gosport Society consultation response letter.

Address (and brief description of application)Conservation Area or Buildings StatusApplication references
113-114 High Street, Gosport – Externally illuminated shop signage. – GS Response, No Objection.High Street24/00361/ADVT
Daedalus Waterfront, Lee-on-the-Solent – Detailed information of the new infrastructure servicing the outline approval under Condition 4. – GS Response, No Objection.Daedalus24/00363/DETS
20-24 High Street, Gosport – two storey extension and new roof terrace with external alterations to create nine (9) flats. – GS Response, Objection.High Street24/00322/FULL
St Marys Parish Church Centre, Green Road, Gosport – Single storey extensions. Annexe and canopies with solar panels and landscape scheme. – GS Response, No Objection.Anglesey and Alverstoke24/00362/FULL
9 The Ordnance Yard Searle Drive, Gosport – Tree maintenance. – GS Response, No Comment due to inadequate information.Priddys Hard24/00369/TPO
20 Bury Road Road Gosport – Retrospective application for construction of external kitchen and laundry equipment flues subject of a Noise Abatement Order from Environmental Health Officer. – GS Response, Strong Objection.Bury Road24/00375/FULL
St Vincent House, Forton Road, Gosport – Erection of timber shed and fence to side of principal elevation. – GS Response, Objection.Forton Road24/003676/FULL
Immigration Removal Centre, 2 Dolphin Way, Gosport – Erection of new Generators, Electrical Plant and Substation boiuldings with flood barrier, gates and fencing. – GS Response, Strong Objection.Haslar Barracks24/00382/FULL
21A Ashburton Road, Gosport – Tree maintenance works. – GS Response, No Objection.Anglesey and Alverstoke24/00388/TPO
4 Wakefield Place Gosport – Tree maintenance works. – GS Response, No Objection.Anglesey and Alverstoke24/00395/TPO
Former Gunboat Yard, Haslar Road Gosport – Demolition of former guardhouse and new timber enclosure for new substation. – GS Response, No Objection.Haslar Peninsula and Grade II Listed Building24/00402/FULL and 24/00403/LBA
71 Western Way, Gosport – Construction of two-storey side extension. – GS Response, No Objection.Locally Listed Building24/00399/FULL
Diving Museum, No.2 Battery, Stokes Bay Road, Gosport – Display of 3 no. advertisements. – GS Response, No Objection.Stokes Bay and Grade II Listed Building24/00408/ADVT
Diving Museum, No.2 Battery, Stokes Bay Road, Gosport – Siting of new external exhibit in frontage. – GS Response, No Objection.Stokes Bay and Grade II Listed Building24/00409/FULL
South Street, High Street and Mumby Road, Gosport – Freestanding digital totem signs and 3 digital display signs to new bus shelter. – GS Response, No Objection.High Street24/00047/FULL
Granary and Bakery, Weevil Lane, Gosport – New secondary glazing. To existing first floor windows. – GS Response, Objection.Royal Clarence Yard and Grade II Listed Building24/00418/LBA
Various locations across Gosport Borough, Gosport – New Information/Interpretation Signs. – GS Response, Under Consideration.Various Conservation Areas24/00422/ADVT
139 High Street, Lee-on-the-Solent – New 4-storey building comprising Ground Floor retail unit and three flats over. Amended scheme following previous consent ref. 21/00492/FULL – GS Response, Under Consideration.Lee-on-the-Solent24/00422/ADVT
113-114 High Street, Gosport – Increase to 12 HMO units from previously approved scheme for 10 HMO units. Amended scheme. – GS Response, Under Consideration.High Street24/00422/ADVT

MAJOR DEVELOPMENTS AND OTHER MATTERS UNDER CONSULTATION

Nothing to report

LIAISON MEETING WITH HEAD OF DEVELOPMENT CONTROL AND CONSERVATION & DESIGN OFFICER

A meeting to be arranged later in the winter.

PREVIOUSLY CONSIDERED APPLICATIONS & PLANNING DECISIONS

Notes on any of the more interesting, contentious and important applications, which have been sent to the Gosport Society for consultation. Also notes on applications considered by the Regulatory Board. Uncontroversial decisions are often decided by the Planning Department under their delegated powers. Those are not recorded here unless the decision was notable for another reason.

Meetings and minutes

• The next meeting of the Regulatory Board will be held on 29 January 2025 at 6:00pm in the Council Chamber. Attendees are required to be seated before the meeting commences.

• The last meeting of the Regulatory Board was held on 4 December 2024. The agenda and draft minutes can be seen on the link below:

https://democracy.gosport.gov.uk/ieListDocuments.aspx?CId=140&MId=462&Ver=4

END

RH/241113